Agentic Document Extraction in Energy & Utilities

Energy and utility companies process millions of documents every day—engineering drawings, inspection reports, work orders, compliance filings, and asset documentation.

Manual review slows operations and limits visibility into critical infrastructure data.

LandingAI transforms these documents into verified structured data so teams can automate asset management, compliance, and operational workflows.

Why Agentic Document Extraction for
Energy & Utilities

Accurate across Technical Document Formats

Energy and utilities operations span structured invoices, handwritten field reports, engineering schematics, and multi-page regulatory filings; agentic extraction handles all of them without format-specific configuration.

Accurate across Technical Document Formats

Speed That Compresses Project Timelines

Automating document processing across procurement, compliance, and asset workflows reduces the administrative cycles that hold up permitting decisions, commissioning milestones, and rate approvals.

Speed That Compresses Project Timelines

Traceable Outputs for Regulated Operations

Every extracted value is grounded to a precise location in the source document, giving compliance teams the audit trail that FERC, NERC, and EPA reporting requirements demand across every submission.

Traceable Outputs for Regulated Operations
Key capabilities

Built for Complex Energy & Utility Documents

Intelligent document processing across oil and gas operations, electric and gas utilities, renewable energy development, and energy trading is extremely difficult due to the sheer diversity of document types, the inconsistent layouts and the domain expertise required. Then add multiple languages, handwriting, photographs, scans and faxes to the complexity.

Accurate parsing of dense tables that span multiple pages and contain merged cells.

Single pipeline for image, slide, document, and spreadsheet file types with 1000+ pages.

Strong recognition of character-based languages, handwriting, checkboxes, stamps and signatures.

Schema-driven field extraction with visual grounding traceable to the original document.

Use cases

Regulatory Compliance Filing

Regulatory Compliance Filing

Extract data fields, reporting metrics, and supporting evidence from FERC rate filings, NERC compliance reports, environmental permits, and environmental impact assessments to support accurate and timely regulatory submissions.

Impact
  • Accelerate filing prep to meet regulatory deadlines and rate approval schedules
  • Reduce compliance staff hours on manual data extraction and document assembly
  • Minimize penalty exposure from filing errors with traceable, verifiable extraction output
Vendor Invoice & Contract Processing

Vendor Invoice & Contract Processing

Extract invoice details, purchase order references, and contract rates from vendor invoices, change orders, and service contracts to enforce contracted pricing and accelerate accounts payable cycles.

Impact
  • Capture early payment discounts by compressing invoice approval cycle times
  • Eliminate manual data entry and duplicate payment errors across contractor volumes
  • Maintain audit-ready doc for contract disputes and regulatory cost recovery filings
Asset & Field Operations

Asset & Field Operations

Extract asset attributes, equipment tags, process dependencies, and maintenance histories from P&ID drawings, as-built drawings, equipment inspection records, and maintenance reports to feed asset management and operational readiness systems.

Impact
  • Accelerate commissioning and handover timelines
  • Reduce time spent finding and reconciling records across systems
  • Ensure inspection and maintenance records are complete and traceable for audits

Trusted for Document-Heavy Energy & Utilities Workflows

Agentic Document Extraction enables energy & utilities institutions to automate document-intensive processes that traditionally require manual review.

Very often a loan officer who gets a borrower a solid preapproval fastest earns the deal and the real estate agent’s referrals. Reconstructing income is the hardest part, and Agentic Document Extraction is the cornerstone to getting it right and traceable. Accurate data upfront means we can get a cleaner loan file to the underwriter and get to CTC faster. Get it wrong and everything downstream gets affected.”

View case study →
Loan Processing
Myra D'Souza
Myra D'SouzaCEO, Autyn
Autyn

Agentic Document Extraction has proven to be both accurate and easy to use. We are building on that foundation to deliver reliable, transparent, and scalable automation that our customers can validate and trust.”

View case study →
Business Process Automation
Neil Walker
Neil WalkerHead of Product, TCG Process
TCG Process

Trust is the product. Accuracy alone isn’t enough at enterprise scale—what matters is provenance, traceability, and control. LandingAI gives us confidence that every extracted value can be traced back to its source, audited, and defended. That’s what makes it deployable in regulated, real-world environments.”

View case study →
Fortune 100 Financial Services
Head of Data & Analytics, Global Financial Services Firm

Our Plan Review Agent has a lot of complicated components under the hood: traversing building code knowledge graphs, reasoning across disciplines and sheets, assessing issues informed by historical projects. None of it works if we can’t trust what came off the page. ADE gave us a reliable foundation, so our team could focus on incorporating our team’s expertise into our compliance reasoning system.”

View case study →
AI-Powered Compliance Review
Daniel Valner
Daniel ValnerProduct Manager, GreenLite
GreenLite

ADE has significantly outperformed other document extractors we’ve used. It has helped us build an Agentic RAG answer engine, based on unique healthcare institutional content, to offer instant, validated support to medical professionals at the point of care.”

View case study →
HealthTech Platform
Dr. Declan Kelly
Dr. Declan KellyFounder and CEO, Eolas Medical
Eolas Medical

I appreciate its reliability and the fact that they're constantly innovating with new models, which helps us work smarter. The service is essential for handling heavy workloads in financial institutions as it provides the necessary infrastructure for high accuracy and fast throughput. I also find it adaptable to specific use cases because they're always working on new models.”

Banking · Workflow Automation
Hugo Cortada Solá
Hugo Cortada SoláGeneral Manager, Serimag
Serimag

We use LandingAI's Agentic Document Extraction to build pipelines that turn unstructured text into structured data. First, the NER (Named Entity Recognition) detection has amazing accuracy. Second, the OCR capability is excellent — earlier I had to run a separate PDF extractor for text plus a separate LLM with OCR to summarize images, and now it's one step. Third, the image boundary detection is a standout.”

Document AI Pipelines
Nilanjan Sahu
Nilanjan SahuSr. Lead Data Scientist, Sigmoid
Sigmoid

We ran a structured bake-off: the same five PDFs (ranging from a 12-page slide deck to a 400-page machinery manual) processed through other products and Landing AI's Agentic Document Extraction (ADE). We scored each tool on four criteria: Table fidelity, Figure extraction, Chunk typing, Scale. Landing AI ADE was the only tool that scored well on all four.”

Document Extraction Benchmark
P.K Mishra
P.K MishraFounder, Praxium

Very often a loan officer who gets a borrower a solid preapproval fastest earns the deal and the real estate agent’s referrals. Reconstructing income is the hardest part, and Agentic Document Extraction is the cornerstone to getting it right and traceable. Accurate data upfront means we can get a cleaner loan file to the underwriter and get to CTC faster. Get it wrong and everything downstream gets affected.”

View case study →
Loan Processing
Myra D'Souza
Myra D'SouzaCEO, Autyn
Autyn

Agentic Document Extraction has proven to be both accurate and easy to use. We are building on that foundation to deliver reliable, transparent, and scalable automation that our customers can validate and trust.”

View case study →
Business Process Automation
Neil Walker
Neil WalkerHead of Product, TCG Process
TCG Process

Trust is the product. Accuracy alone isn’t enough at enterprise scale—what matters is provenance, traceability, and control. LandingAI gives us confidence that every extracted value can be traced back to its source, audited, and defended. That’s what makes it deployable in regulated, real-world environments.”

View case study →
Fortune 100 Financial Services
Head of Data & Analytics, Global Financial Services Firm

Our Plan Review Agent has a lot of complicated components under the hood: traversing building code knowledge graphs, reasoning across disciplines and sheets, assessing issues informed by historical projects. None of it works if we can’t trust what came off the page. ADE gave us a reliable foundation, so our team could focus on incorporating our team’s expertise into our compliance reasoning system.”

View case study →
AI-Powered Compliance Review
Daniel Valner
Daniel ValnerProduct Manager, GreenLite
GreenLite

ADE has significantly outperformed other document extractors we’ve used. It has helped us build an Agentic RAG answer engine, based on unique healthcare institutional content, to offer instant, validated support to medical professionals at the point of care.”

View case study →
HealthTech Platform
Dr. Declan Kelly
Dr. Declan KellyFounder and CEO, Eolas Medical
Eolas Medical

I appreciate its reliability and the fact that they're constantly innovating with new models, which helps us work smarter. The service is essential for handling heavy workloads in financial institutions as it provides the necessary infrastructure for high accuracy and fast throughput. I also find it adaptable to specific use cases because they're always working on new models.”

Banking · Workflow Automation
Hugo Cortada Solá
Hugo Cortada SoláGeneral Manager, Serimag
Serimag

We use LandingAI's Agentic Document Extraction to build pipelines that turn unstructured text into structured data. First, the NER (Named Entity Recognition) detection has amazing accuracy. Second, the OCR capability is excellent — earlier I had to run a separate PDF extractor for text plus a separate LLM with OCR to summarize images, and now it's one step. Third, the image boundary detection is a standout.”

Document AI Pipelines
Nilanjan Sahu
Nilanjan SahuSr. Lead Data Scientist, Sigmoid
Sigmoid

We ran a structured bake-off: the same five PDFs (ranging from a 12-page slide deck to a 400-page machinery manual) processed through other products and Landing AI's Agentic Document Extraction (ADE). We scored each tool on four criteria: Table fidelity, Figure extraction, Chunk typing, Scale. Landing AI ADE was the only tool that scored well on all four.”

Document Extraction Benchmark
P.K Mishra
P.K MishraFounder, Praxium

Start Extracting in Minutes, Not Months

Production-ready AI extraction pipeline with document understanding.